Ablett Pavilion



Ablett Pavilion re-development at Myrtleford RC McNamara Reserve was completed in 2010.

WrightBarrat were engaged as the consulting structural engineers. The structural works involved the modification of the existing building accommodating a complex cantilevered canopy which was modeled and analysed as a 3D frame. The suspended upper level decks were constructed using bondek supported from steelwork, some of which incorporated decorative steel details.

Cantilever reinforced concrete block retaining walls were constructed at ground level.