02 6021 3335

Berry Street Reconstruction

 

BERRY STREET RECONSTRUCTION

WrightBarrat were engaged to design and document a full road reconstruction with several options considered. Several designs where conducted with costs estimated.

The design was required due to the degradation of the street, removal of bridge crossings and renewal of water and drainage infrastructure. The design was completed for Albury City Council.